Tell us the scope and the ZIP. You get a real delivered-and-installed number, not a callback to discuss your needs.
We quote the structure and the site work as separate lines, because that is the only way the number means anything. The structure price is firm once a design is locked. Site work depends on your lot — foundation type, how far utilities have to run, whether the truck can get close enough that crane reach stays inside the included envelope, what your jurisdiction charges for permits, and how many loaded miles the freight covers.
What gets you an accurate number fastest: a site address, a photo of the placement area, and a rough square footage. From those three things we can usually get within a few percent without a site visit.
We start with what the site will actually allow: zoning, setbacks, utility availability, flood zone, access width for a truck and crane, and whether the jurisdiction has a defined modular pathway. This is where projects get saved or killed, and it costs nothing to find out.
Layout, finish level and options are locked, and the price for the building is set at that point. Site work is priced separately and transparently, because that is the number that varies with your specific lot and the one most suppliers hide until you are committed.
Plans go to the state modular program or local authority while the site work begins. Running these concurrently rather than sequentially is where most of the schedule advantage lives.
Your unit enters the line. Framing, envelope, mechanical rough-in, insulation, drywall, finish, fixtures and cabinetry happen at successive stations with inspection at each. You get progress documentation rather than guesses.
Foundation is poured or set, utilities are trenched and stubbed, access is prepared for the delivery truck and crane. This runs while your unit is in production.
Modules are transported and craned onto the foundation. For a single-module building this is typically a matter of hours, not days — the set itself is the fastest part of the entire project.
Marriage lines are joined, mechanicals and utilities are connected, exterior finishes are completed at the seams, final inspection is called, and you get your certificate of occupancy along with documentation.
These are in the tool above as separate lines. Most quotes fold them into a per-square-foot number or leave them out until you are committed.
| Foundation | $38–$52 per sq ft |
| Utility trenching | First 50 ft typical, then $185 per ft |
| Crane | Included to 100 ft reach, then $2,900 + $95 per ft |
| Permits and plan check | $8,900 |
| Survey, staking and certification | $5,400 |
| Site clearing and grading | $4,200 |
| Slope or poor soil adder | $3,600 |
| Septic system | $14,500 |
| Well | $11,800 |
| Electrical service upgrade | $3,400 |
| Demolition of existing structure | $9,200 |
| Freight | $7 per loaded mile |
Tell us the scope and the ZIP. You get a real delivered-and-installed number, not a "contact us for pricing" runaround.